Abstract
Nitrogen (N) transformations and removal in integrated constructed wetlands (ICWs) are often high, but the contributions of various pathways, including nitrification/denitrification, assimilation by plants and sediment storage, remain unclear. This study quantified the contributions of different N removal pathways in a typical multi-celled ICW system treating domestic wastewater. Findings showed near complete average total N retention of circa 95% at 102.3 g m⁻² yr⁻¹ during the 4-year period of operation. Variations in total N and NH4-N removal rates were associated with effluent flow volume rates and seasons. According to the mass balance estimation, assimilation by plants and sediment/soil storage accounted for approximately 23% and 20%, respectively, of the total N load removal. These were the major N removal route besides microbial transformations. Thus, the combination of plants with high biomass production offer valuable opportunities for improving ICW performance. The retrieval and use of sequestered N in the ICW sediment/soils require coherent management and provide innovative and valuable opportunities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.