Abstract

The aim of this study was to evaluate the removal of nitrogen and organic matter in real municipal wastewater using a structured bed reactor operated under different intermittent aeration (IA) cycles, as well as to verify if these cycles interfere in the concentration of nitrifying and denitrifying bacteria. Three phases of aeration (O) and non-aeration (A) were studied in this research: phase 1 (4 h O/2 h A); 2 (2 h O/1 h A) and 3 (2 h O/2 h A). Even with the variation in the operating conditions and the different loads of organic matter and nitrogen applied, the system remained stable in relation to the removal of organic matter (above 80%). The best condition for removal of NH4-N and TKN was obtained in phase 2, with removal percentages of 86 ± 15 and 80 ± 15% respectively. The results of phase 2 for the removal of NH4-N, denitrification (74 ± 15%) and removal of TN (68 ± 9%), indicated that at this stage the simultaneous denitrification and nitrification process (SDN) occurred. At this stage, the mean concentration of AOB was 3.1010 MPN gVSS−1, NOB 1.107 MPN gVSS−1 and denitrifying 9.1011 MPN gVSS−1. The analysis of variance (factorial ANOVA) applied to the different groups of microorganisms analyzed indicated that there was a significant difference among the abundance of these organisms in the different IA cycles, but the difference among these groups depends on which places and phases are being considered.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.