Abstract
This report summarizes experimentally and numerically determined modal properties for one of the reinforced concrete end walls of the NIF Periscope Support Structure in Laser Bay 1. Two methods were used to determine these modal properties: (1) Computational finite-element analyses (modal extraction process); and (2) Experimental modal analysis based on measured test data. This report also includes experimentally determined modal properties for a prototype LM3/Polarizer line-replaceable unit (LRU) and a prototype PEPC LRU. Two important parameters, used during the design phase, are validated through testing [ref 1]. These parameters are the natural frequencies and modal damping (of the system in question) for the first several global modes of vibration. Experimental modal testing provides these modal values, along with the corresponding mode shapes. Another important parameter, the input excitation (expected during normal operation of the NIF laser system) [ref 1], can be verified by performing a series of ambient vibration measurements in the vicinity of the particular system (or subsystem) of interest. The topic of ambient input excitation will be covered in a separate report. Due to the large mass of the Periscope Pedestal, it is difficult to excite the entire series of Periscope Pedestal Walls all at once. It wasmore » decided that the experimental modal tests would be performed on just one Periscope End Wall in Laser Bay 1. Experimental modal properties for the Periscope End Wall have been used to validate and update the FE analyses. Results from the analyses and modal tests support the conclusion that the Periscope Pedestal will not exceed the stability budget, which is described in reference 1. The results of the modal tests for the Periscope End Wall in Laser Bay 1 have provided examples of modal properties that can be derived from future modal tests of the entire Periscope Assembly (excluding the LRU's). This next series of larger modal tests can be performed after the support structure for the Periscope Assembly has been completed. There are five optical elements in the Periscope Assembly: PEPC; Polarizer; LM3; LM2; and the Periscope Light Source. All of these optical elements have stability requirements except for the PEPC. During the Title II Design phase, two prototypes of the LM3/Polarizer LRU were used in two different series of modal tests [ref 2,3]. A similar series of modal tests were conducted on a prototype of the PEPC LRU. The results of the modal tests were used to verify the modal properties assumed for use in the corresponding finite-element analyses.« less
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.