Abstract

NGH (Natural Gas Hydrate)-FPSO is deemed as one of the attractive solutions for relatively small gas fields. NGH process plant is installed on board FPSO and it produces NGH from raw gas transferred directly from subsea wells through flowlines and risers. For 3 years since 2004, we have been investigating tandem offloading system for NGH-FPSO and a shuttle tanker in the south east Asia and Oceania. We evaluated workability of the tandem offloading system for NGH-FPSO under combined environmental conditions. As a result, we confirmed that workability under the offloading conditions attained 100% by using a mooring unit that has large restitution force. Based on the aforementioned results, we carried out a safety assessment of the offloading system according to HAZID (Hazard Identification Study) and were awarded AIP (Approval in Principle) by NK. Furthermore, comparison of economical efficiency between NGH-Chain and LNG-Chain, under the conditions that gas production was between 48 to 275MMscfd, the production period was 30 years, and the destination was Japan, indicated that NGH was advantageous when gas production was 80MMscfd or less. The results of investigation on the tandem offloading system for NGH-FPSO are reported in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.