Abstract

The South Hartford Conveyance and Storage Tunnel is a major component of Hartford Metropolitan District's Clean Water Project. It is intended to capture and store combined sewer overflows from the southern portion of Hartford, CT, and sanitary sewer overflows from West Hartford and Newington, CT. The project is estimated to cost approximately $US500 M and will be constructed under multiple construction contracts. The project components include a deep rock tunnel 6.6 km long and 7.6 m excavated diameter, several kilometers of consolidation sewers, multiple hydraulic drop shafts with deaeration chambers and a 100 MLD pumping station for tunnel dewatering. The tunnel boring machine-bored tunnel will be excavated in shale, siltstone and basalt through several fault zones. An AECOM led team is currently performing the final design for the project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.