Abstract

Two track gauges coexist in Spain, the Iberian gauge (1668 mm) and the international gauge (1435 mm). Solutions applied on the track were considered to improve the interoperability in Spain. First solution proposed was tracks with two-gauge-ready sleepers. This solution allows changing the gauge from Iberian to International gauge or from International to Iberian gauge. The need of two gauges evolved this solution to the third rail system with two-simultaneous-gauge sleepers. In this paper, a new third-rail track solution is proposed. This solution is a novel system based on the introduction of special concrete blocks between the existing sleepers to fasten the third rail. Thus, the conventional railroad track becomes in a double-simultaneous-gauge lines without needing change existing sleepers and make long traffic interruptions of the track like in common third-rail systems. In the present study, threedimensional numerical models are generated using finite-element method. The analysis of the vertical displacements of the top head of the rails, vertical stresses transmitted to the substructure layers and vertical track stiffness, demonstrate the good vertical performance of the new system compared to the conventional lines with dual-gauge-ready sleepers and the common third rail tracks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.