Abstract

This paper introduces a systematic methodology and corresponding tools to support the decision-making process for the integration of various improvement options, including new technologies, into existing mature processes. The proposed methodology was applied on a case study focusing on planning the capacity supply to meet the projected electricity demand for the fleet of electric generating stations owned and operated by Ontario Power Generation (OPG). A deterministic mixed integer linear program with a goal to minimize total annualized costs while satisfying various CO2 emission constraints was developed. The results show that achieving the CO2 emission mitigation goal while minimizing costs affects the configuration of the OPG fleet in terms of generation mix, capacity, selection of new technologies and optimal configuration with and without new technologies. By using new technologies including integrated gasification combined cycle (IGCC) and natural gas combined cycle (NGCC) with and without carbon capture and sequestration, the optimum electricity cost obtained was 1.1661¢/KWh at base caseload demand with 60% CO2 reduction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.