Abstract

Existing Bayesian reliability demonstration method only make use of system level data to form the prior distribution. This becomes a problem when the only prior data available are the subsystem test data. Such scenario does happen for large scale electronic equipment. To solve this problem, a method is proposed to derive the Bayesian reliability demonstration test plan for systems with exponential subsystem data. Firstly, the subsystem test data are used to calculate the confidence bound of system failure rate. Then, the two percentile method is applied to determine the prior distribution of system failure rate. Finally, a new reliability demonstration test plan is defined according to the Bayesian maximum posterior risk rule. The suggested method can reduce the test duration significantly and is most beneficial for systems that have subsystem test data before the reliability demonstration. A numerical example at the end of the paper illustrates the method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.