Abstract

At HASYLAB the DORIS III project is almost finished. Recently a decision has been made to use DORIS III as a dedicated synchrotron radiation source in the future. So many conflicts between the operational requirements between synchrotron radiation and high energy physics no longer exist. In the moment nine insertion devices with a total length of 28.3 m are routinely operated in DORIS III. Two new insertion device developments for DORIS III are underway. An asymmetric hybrid structure (ASYH) which can be operated in exchange with anyone of the X-ray wigglers will be available by the end of 1993. For place #5, a 4 m long straight section which is presently still free, a hard X-ray wiggler using a 2 T hybrid structure is in the design phase. It is planned to install this device in the second half of 1994. An exciting new opportunity in the decision to use PETRA, a 12 GeV electron storage ring for synchrotron radiation experiments. An undulator beamline is under construction now.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.