Abstract

A new fast valving scheme of steam turbines using two parallel valves for improving the transient stability of a power system is proposed. The influence of the actuation time parameters of a conventional fast valving scheme using a single valve is first studied in detail to justify the need for a parallel valve scheme. A systematic procedure for selecting suitable valve actuation times, the sequence and the conditions to be monitored for implementing a coordinated parallel valve actuation scheme is presented. The proposed scheme is applied to a typical nuclear power plant connected to an infinite busbar system. A four stroke valve operation mode of the scheme is found to improve the second and subsequent swing stability significantly. A multiple stroke operation mode of the scheme for improving the rotor angle damping over a longer period of transient is also presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.