Abstract

We present two new dispatching rules for scheduling in a job shop. These rules combine the process-time and work-content in the queue for the next operation on a job, by making use of additive and alternative approaches. An extensive and rigorous simulation study has been carried out to evaluate the performance of the proposed dispatching rules compared with those by the SPT rule, the WINQ rule, a random rule based on the SPT and WINQ rules, and the best existing rule. The important aspects of the results of the experimental investigation are also discussed in detail.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.