Abstract
1. At the current stage of hydrotechnical construction designs of structures constructed with the complete or maximum use of natural materials and providing complete mechanization of the construction and repair of structures can be most effective. 2. It is necessary to begin immediately experimental laboratory studies and to provide standards on the use of natural materials of the sand-gravel mixture type in designs of hydraulic structures. 3. It is necessary to begin exploration of potential deposits of SGMs and to calculate their reserves.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.