Abstract

ABSTRACTSimultaneous monitoring of the mean vector and covariance matrix in multivariate processes allows practitioners to avoid the inflated false alarm rate that results from using two independent control charts. In this paper, we extend exponentially weighted moving average semicircle and generally weighted moving average semicircle control charts to monitor the mean vector and covariance matrix of multivariate multiple linear regression profiles in Phase II simultaneously. These new control charts are compared with the existing control charts in the literature in terms of the average run length criterion. Finally, a case is considered to show the application of the proposed charts.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call