Abstract

We consider single machine scheduling problems with additional non-renewable resource constraints. Examples for non-renewable resources include raw materials, energy, or money. Usually they have an initial stock and replenishments arrive over time at a-priori known time points and quantities. The jobs have some requirements from the resources and a job can only be started if the available quantity from each of the required resources exceeds the requirements of the job. Upon starting a job, it consumes its requirements which decreases the available quantities of the respective non-renewable resources. There is a broad background for this class of problems. Most of the literature concentrate on the makespan, and the maximum lateness objectives. This paper focuses on the total weighted completion time objective for which the list of the approximation algorithms is very short. We extend that list by considering new special cases and obtain new complexity results and approximation algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.