Abstract

Treatment of transformer neutral point in middle-voltage (MV) networks become an important issue with increasing proportion of MV cables in power networks. As consequence, overall capacitance of MV network is increased and moreover earth fault currents magnitudes. In MV networks with feeding transformer winding in delta connection (isolated networks), that earth fault current increase requires forming of artificial ground point – a neutral connection point on a three-phase ungrounded power system. Grounding transformer use, in zigzag or delty-wye connection, is common, well-known solution for constructing neutral connection in power systems. Physical characteristics of grounding transformers, protection principles, short-circuit calculations with symmetrical components and simulation techniques are presented in this paper. Characteristical operational modalities of MV power networks are also revieved on practical examples.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.