Abstract
This paper presents a neural-network computational scheme with time-delay consideration for solving convex quadratic programming problems. Based on some known results, a delay margin is explicitly determined for the stability of the neural dynamics, under which the states of the neural network does not oscillate. The configuration of the proposed neural network is provided. Operational characteristics of the neural network are demonstrated via numerical examples.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.