Abstract

With the power systems progress, its complexity grows and there is a greater need for good production organization and the need for information that would help in power system planning. As thermal power plants are responsible for covering the base load, the prediction of its production can be used significantly for good power system organization. This paper represents the use of artificial neural networks for the prediction of thermal plants power production. The data used for neural networks training are measurements of thermal power plant production in power systems of Serbia. Trained neural network can be used for prediction of production on yearly basis or for shorter, hourly or daily prediction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.