Abstract

When the sewer collection of a serviced area has not reached the full design capacity of the domestic wastewater treatment plant, mathematical models have the potential to provide useful information for operating the plant to meet discharge standards and managing the received water system. In this article, a back-propagation neural network (BPNN) was applied for predicting wastewater quantity and quality. Three basic models are included in this network, i.e., A1(PIQQ) for predicting influent quantity and quality, A2(PEQQ) for predicting effluent quantity and quality, and A3(PQWCWS) for predicting the quantity and water content of waste sludge. The multi-model (A1 + A2) system that combines A1 and A2 into a noted multi-BPNN (MBPNN) is used for estimating A2 output parameters directly based on A1 input parameters. The correlation coefficient values (R) are higher than 0.95 for A1, whereas the mean absolute percentage errors are less than 35% for A2 and A3, and 46% for A1 + A2. These results indicate that BPNN and MBPNN are suitable for predicting the wastewater quantity and quality especially for Q, BOD5, sludge quantity, and water content in an under-construction sewer system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.