Abstract

The expanded job-shop scheduling problem (EJSSP) is a practical production scheduling problem with processing constraints that are more restrictive and a scheduling objective that is more general than those of the standard job-shop scheduling problem (JSSP). A hybrid approach involving neural networks and genetic algorithm (GA) is presented to solve the problem in this paper. The GA is used for optimization of sequence and a neural network (NN) is used for optimization of operation start times with a fixed sequence. After detailed analysis of an expanded job shop, new types of neurons are defined to construct a constraint neural network (CNN). The neurons can represent processing restrictions and resolve constraint conflicts. CNN with a gradient search algorithm, gradient CNN in short, is applied to the optimization of operation start times with a fixed processing sequence. It is shown that CNN is a general framework representing scheduling problems and gradient CNN can work in parallel for optimization of operation start times of the expanded job shop. Combining gradient CNN with a GA for sequence optimization, a hybrid approach is put forward. The approach has been tested by a large number of simulation cases and practical applications. It has been shown that the hybrid approach is powerful for complex EJSSP.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.