Abstract

This paper introduces a novel extension of the multi-system optimisation method, known as the 3C concept, tailored for optimising budget allocation for bridge interventions at the network level. This extended methodology accounts for the interdependencies among bridges due to their spatial proximity within the network. It incorporates direct and user costs, bridge performance indicators, and a bridge deterioration model. A real-world case study involving a portfolio of 555 bridges demonstrates the practicality of the methodology, efficiently determining the optimal intervention sequence. Over an 18-year analysis period, the proposed methodology achieved a 23% reduction in total costs by combining repairs for bridges with high to severe damage and maintenance for the others. This represents a significant improvement compared to the traditional approach, used by bridge management agencies, which relies exclusively on maintenance. The optimised procedure outperforms human intuition in managing complex bridge networks, particularly over extended periods. This methodology can assist transportation agencies in implementing and exploring various scenarios by adjusting the time between consecutive interventions and budget constraints, supporting comprehensive analysis and informed decision-making.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.