Abstract

A synthesis of current ideas, research trends, and findings is made on some of the better known and other newly developed networking techniques for project management. Using Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) ad a basis of comparison, methods such as Decision Critical Path Method (DCPM), linear flow graphs, and Graphical Evaluation and Review Technique (GERT) are introduced and examined in the light of their application to construction projects. Salient similarities and differences among these methods as well as the capabilities and limitations of each are pointed out. Sufficient information on the mathematical algorithms used in the newer techniques previously mentioned and the necessary steps to use them are provided. Finally, examples of application to civil engineering problems illustrating the use of each method are presented.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.