Abstract
The paper is devoted to the sustainability of the production capacities of mining enterprises when extracting minerals. The timely capacity restoration is the main problem for scientists dealing with sustainable development in mining construction. The paper presents the use of network planning and optimization methods of dynamic programming to solve problems of sustaining the existing capacities of mining enterprises. The proposed methods allow for the integrated use of network planning and dynamic programming to optimize the parameters of mining operations. A network model of the technological scheme of mining operations with optimal parameters is proposed. The necessity of timely restoration of capacities of mining enterprises with the use of network planning and mathematical programming methods in solving these problems is highlighted.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.