Abstract

AbstractEach user, owner, and operator of the bulk power system (BPS) must register with the North American Electric Reliability Corporation (NERC) if the entity performs any of the functions listed in the NERC‐defined functional categories.1 In registration, NERC must prevent duplication of responsibilities.2 Having multiple entities registered in the same functional category for the same BPS facility is antithetical to this fundamental requirement (e.g., two entities registered as the Generator Operator for the same generating facility).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.