Abstract

Abstract Highly depleted reservoirs exhibit sharply lower pore pressures and horizontal stress magnitudes than in the overlying shaly formation. Drilling through such depleted reservoirs can cause severe fluid loss and drilling-induced wellbore instability.Accurate and reliable estimates of horizontal stresses can provide early warning of impending drilling problems that may be mitigated by appropriate drilling fluid design and drilling practices. We have developed a new multi-frequency inversion algorithm for the estimation of maximum and minimum horizontal stress magnitudes using cross-dipole dispersions. Borehole sonic data for the case study presented in this paper was acquired by a cross-dipole sonic tool in a deep-water well, offshore Louisiana in the Gulf of Mexico (GOM). The logged interval spans 1000 ft below the casing shoe. In addition, the Modular Dynamic Tester (MDT)1 mini-frac tests were performed at three depths in shale, yielding two minimum horizontal stress magnitudes. The borehole sonic data was suitable for inversion of cross-dipole dispersions at three depths in shale and also at a depth in a highly depleted sand reservoir. There was one depth in shale above the depleted sand where we could estimate the minimum horizontal stress magnitude using both the MDT mini-frac tests and inversion of borehole sonic data.The results of the two techniques are consistent, providing encouragement for further validation of the multi-frequency inversion of cross-dipole dispersions to estimate horizontal stresses. Even though the overburden stress is expected to increase with depth, both the maximum (SHmax) and minimum (Shmin) horizontal stresses obtained from the inversion of borehole sonic data are significantly smaller in the depleted sand than in the overburden shale. However, both the horizontal stress magnitudes increase again in the shale below the depleted sand. Such rapid variations in horizontal stress magnitudes cause large fluctuations in the safe mud weight window. This challenge in drilling through the depleted sand was successfully handled by using special drilling fluid to mitigate seepage losses and differential sticking in the depleted sand and overlying shale.We have also performed Dipole Radial Profiling (DRP) of formation shear slownesses using the measured cross-dipole dispersions at three depths in shale and one in the highly depleted sand. Analysis of radial profiles in the two orthogonal directions indicates plastic yielding or stiffening of rock in the near-wellbore region. While plastic yielding increases the shear slowness, stiffening would reduce the shear slowness.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.