Abstract

China is in charge of most of Poloidal Field (PF) conductors production for the International Thermonuclear Experimental Reactor (ITER). The execution for PF conductors shall be in three main phases. According to ITER Procurement Arrangement (PA), the Domestic Agency (DA) shall be required to verify the room and low temperature acceptance tests carried out by the strand suppliers. As the reference laboratory of Chinese DA (CNDA), the superconducting strands test laboratory of Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP) was undertaking the task of strands verification for ITER conductors. The verification test includes: diameter, Nickel plating thickness, copper-to-non-copper volume ratio, twist pitch direction and length, standard critical current (IC) and resistive transition index (n), residual resistance ration (RRR), and hysteresis loss. 48 NbTi strands with 7 billets were supplied for the PF Cable-In-Conduit Conductor (CICC) process qualification. In total, 54 samples were measured. The verification level for PF CICC process qualification was 100%. The test method, facility and results of each item are described in detail in this publication.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.