Abstract
Planning and construction of Navy's new berthing facilities for Forrestal-class aircraft carriers at San Diego are described; facilities include installation of retractable fender system, camels, and cranes, modification of utilities at existing wharf, and dredging of turning basin and of 6.7 mi deep draft channel in SAN Diego Bay.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.