Abstract

The objective of the study was to find out the present scenario of delays of retrofitting of public building with case of 11projects of Kathmandu valley. An observation and study of the project document is carried out along with questionnaire survey with 50 respondents. The maximum rate of delay in the retrofitting project is found to be 167% time overrun and minimum is found to be 42% of time overrun. Only one project among them is within the schedule with physical progress of 22%. A multiple linear regression analysis was performed to examine the influence of the variables Time overrun (Months) and Time extension with respect to initial contract (%) on the variable Physical Progress. A model summary model is obtained as follows: Physical Progress = 0.57 + 0.02 * Time overrun (Months) - 0.15 * Time extension with respect to initial contract (%) The top ranked specific delay contributing factors in a retrofitting project are as found as Impractical project schedule and duration (frequent changes in critical path), Unavailability of the numbers and skilled workforce for retrofitting projects, Delays occurred due to lack of coherence in architectural, structural, electrical, sanitary, and HVAC drawings, Approvals of shop drawings submitted by the contractor and Unavailability of the specific materials as per BOQ.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.