Abstract

Abstract : Based on a review of available information, visual observations of conditions as they existed on the date of the field inspections, and supporting engineering calculations, the general condition of the Pond 3 is considered to be fair. This assessment is based primarily on visual observations of embankment, spillway and seepage conditions and hydrology/hydraulic analyses of reservoir/spillway capacity. The structure is classified as a 'small' size, 'high' hazard dam. Corps of Engineers guidelines recommend 0.5 to one times the Probable Maximum Flood (PMF) as the Spillway Design Flood for a 'small' size, 'high' hazard dam. The Pond 3's Spillway Design Flood is the Probable Maximum Flood because of its height. Spillway capacity is 'inadequate' because the nonovertopping flood discharge was found, by using the HEC-1 computer program, to be 35 percent of the PMF. At 0.5 PMF, the embankment overtopping depth and duration would be 0.58 feet and eight hours and 40 minutes respectively. In the opinion of the evaluating engineer, this overtopping depth and duration would not cause a catastrophic failure of the embankment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.