Abstract

Abstract : The assessment of Bigby Run Dam is based upon visual observations made at the time of inspection, review of available records and data, hydraulic and hydrologic computations and past operational performance. The Bigby Run Dam appears to be in fair condition. Maintenance is considered fair. The concrete spillway is deteriorating with marked deterioration on the right spillway wall. Minor seepage was observed at the toe of the dam, adjacent to the left abutment contact. Seepage was estimated at 2 to 5 gallons per minute. The seepage should be monitored. The Bigby Run Dam is a high hazard-small size dam. The recommended Spillway Design Flood (SDF), for a dam of this size and classification, is in the range of 1/2 PMF to PMF. Since the Bigby Run Dam just meets the minimum criteria; and since the dam is located in a rural area suggesting only appreciable economic loss; compliance with the current practice of the Baltimore District Corps of Engineers leads to the selection of the 1/2 PMF as the Spillway Design Flood (SDF).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.