Abstract
This research aims to enhance the accuracy of Construction Cost Index (CCI) forecasting using Holt-Winters exponential smoothing (ES) by optimizing its parameters, focusing on minimizing the Mean Absolute Percentage Error (MAPE) for precise CCI forecasts. To reach this aim, The Holt-Winters model parameters are optimized through Particle Swarm Optimization (PSO) and Walk-Forward Cross-Validation (WFCV). PSO, a metaheuristic optimization algorithm, is being applied to search for optimal values of the smoothing parameters (alpha, beta, and gamma) that determine the weightage of past observations, trends, and seasonality, respectively. WFCV is assessed the model's performance and ensures robustness. Reduced MAPEs of 22 for CCI forecasts and 2 for training data are the findings of the optimized Holt-Winters model. The obtained alpha, beta, and gamma values are 0.99, 0.77, and 0, respectively, highlighting the importance of while neglecting seasonality. Convergence graphs demonstrate the superiority of the optimization approach over conventional parameter values or random selections. By employing PSO and WFCV, the study efficiently fine-tunes the Holt-Winters model for precise CCI forecasting. Optimized parameter values enable data driven decision-making in construction project cost estimation and budget management. This research contributes a reliable and robust optimization methodology for CCI forecasting, supporting advancements in the field.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.