Abstract

Nitrite has been commonly recognized as an important factor causing N(2)O production, which weakened the advantages of nitrogen removal via nitrite. To reduce and control N(2)O production from wastewater treatment plants, both long-term and batch tests were carried out to investigate main sources and pathways of N(2)O production during nitrogen removal via nitrite from real domestic wastewater. The obtained results showed that N(2)O production during nitrogen removal via nitrite was 1.5 times as much as that during nitrogen removal via nitrate. It was further demonstrated that ammonia oxidization were main source of N(2)O production during nitrogen removal from domestic wastewater; whereas, almost no N(2)O was produced during nitrite oxidization and anoxic denitrification. N(2)O production during nitrogen removal via nitrite decreased about 50% by applying the step-feed SBR, due to the effective control of nitrite and ammonia, the precursors of N(2)O production. Therefore, the step-feed system is recommended as an effective method to reduce N(2)O production during nitrogen removal via nitrite from domestic wastewater.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.