Abstract
凝汽设备是电厂凝汽式汽轮机装置的一个重要组成部分,凝汽设备工作的好坏直接影响到整个装置的热经济性和运行可靠性。本文参照我公司武汉汽轮机厂产CC25-3.43/1.27/0.49的运行实际状况,简要论述凝汽设备的运行调整。 The condensing equipment is an important part of the condensing steam turbine unit in power plant, it directly affects the entire unit thermal efficiency and operational reliability. This article gives the solution of how to adjust the operation of the condensing equipment according to the actual operation situation of CC25-3.43/1.27/0.49 steam tubine which is produced in CCJEC.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.