Abstract

This paper reports the main mast inclination and cable stretching procedure of the fixed roof of Toyota stadium. It has four main mast inclined by 7.5deg. from virtical line, then this paper describes the mast erection & inclination method on site. Also this paper describes the control process of cable stretching.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.