Abstract

Wastewater management becomes a complex undertaking when there are different government agencies engaging in different programmes, such as the case in the Lake Biwa catchment area. The timing of the completion of conventional municipal sewerage systems linked to a large regional wastewater system under construction is likely to become a deciding factor for introduction of interim measures in places where wastelord reduction by sewerage will not take place for some time. An interactive model designed to assess various sewerage investment scenarios vs. wasteload reduction profiles was introduced here for use in examining various interim planning options.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.