Abstract
The slab caster No.5 was put into operation in September, 1984 at NKK Fukuyama Works, which was directly connected with the hot strip mill No.2 for the purpose of Hot Direct Rolling Process (HDR). To realize the HDR this caster is provided with various automatic facilities and with several characteristics on operation such as mentioned below. (1) For high speed casting (over 2.0 m/min); low viscosity mold powder (lithium being added), nonsinusoidal oscillation, and mold copper plate, etc. (2) For high temperature slab discharging; heat insulating apparatus, secondary cooling with width control system, and slab edge heater. (3) For improvement of surface and inner quality of slab; accurate mold level control, optimum design of immersion nozzle, air mist cooling, etc. By these newly developed techniques the monthly production by the HDR process was increased up to 100 thousand tons of steel. This report describes the new facilities and the operation technologies developed for this HDR process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.