Abstract

At present, the operation structures and technical developments of coastwise Liners are facing a turning point.Since early 1997, the modernization of ship machinery system of a 499gross tonnage coastwise steel-cargo vessel is designed by the Modernization Committee of Coastwise Vessels and subsidized by the Ship and Ocean Foundation.As design concepts of the modernization, modular fabricated machinery units, an integrated automatic control system of engine room machinery at the bridge and an inverter control system of sea water cooling pump, Brainless measures, a combined use electric generator for the bow-thruster are mainly adopted.Effectiveness of this modernization project is surveyed during the verification test from February 1997 to March 1998.As a result, modular fabrication contributed to reduce the construction period and cost, the Brainless measures contributed to reduce the workload and cleaning time for the engine crews, and the inverter system saved the total electric consumption.This verification test apparently proposes for considerations of the modernization for the coastwise vessels from financial, technological and workload points of view.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.