Abstract

This paper describes the effect of mutual leakage reactance in rotor circuit on analysis of generator transient characteristics. The authors derived a detailed equivalent circuit model for 48P-15750kVA generator, and analyzed sudden short circuit, asynchronizing phenomena of the generator by simulations using the electromagnetic transients program (ATP-EMTP), and compared the results with the experimental data.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call