Abstract

沉蕲春花园水库为粘土心墙砂壳坝,自1956年运行以来一直存在渗漏等隐患,由于年久失修,不符合现行安全规范,需要进行加固补强处理。进行原因分析并实施了相应的技术方案之后,该坝的整体加固效果显著。重点介绍了灌浆部分工作,其加固技术方案为今后同类型工程积累了宝贵的经验。 The dam of Qichun Garden Reservoir is a shell sand dam with clay core wall. Since the operation in 1956, leakage and other hazards have existed. Having been in bad repair for long years, it doesn’t meet current safety standards and needs reinforcement processing. After the analysis of causes and the implementation of the relevant technical scheme, the integrated function of the dam has been improved significantly. Focusing on the work of grouting, the technical scheme of reinforcement accumulates valuable experience for the similar projects in the future.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.