Abstract

The deposits of Minami Kanto gas field is very thick and reserves amout of methane and iodine. Production wells are completed with long perforated pipes. Most of these wells are tubingless and the artificial lift method is continuous gas lift.I have developed a simulator which is formed with a three dimensional, two-phase double porosity reservoir model and a gas lift program. Using this simulator, production rates of wells can be predicted and production tests are analized exactly.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.