我国东南沿海地区台风灾害发生频繁,对电网造成较为严重的破坏。灾后电力抢修以短时间内恢复供电为主要目的,抢修施工具有难度大、工期紧、任务重、投入高等特点,工程抢修结算一般采用工程完工后据实结算的方式,难以进行有效的预结算控制。通过对近几年抢修工程结算实例分析,总结台风抢修工程费用构成特点,从人材机消耗量和单价、措施费、间接费、其他费用四方面分析工程结算费用较常规技改检修工程的不同,旨在通过对台风电力抢修工程费用的特点分析,为今后台风电力抢修工程计价以及相关定额、预规的编制与完善提供一定的参考依据。 In the southeast coastal areas of China, typhoon disasters occur frequently, which cause serious damage to the power grid. The main purpose of repair construction is restoring the power supply in short time, the features of which are difficulty, tight, heavy task and high investment. After the completion of the engineering repair project, it is difficult to effectively control the settlement by the way of general engineering repair settlement according to the fact. The composition characteristics of typhoon repair engineering cost have been summarized through the analysis of engineering repair settlement case in recent years. Compared with the conventional technological overhaul project, engineering repair settlement has difference in the consumption and unit price of labor, materials and machinery, measure fee, indirect costs and other expenses. The purpose of this study is to analyze the characteristics of typhoon power repair project cost, and to provide a reference for the future typhoon power repair project pricing and related quota, preparation and improvement of the schedule.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call