Abstract

This study clarifies the continuity and the discontinuity between urban infrastructure by Post-war reconstruction urban planning (PWRUP) project and recent central city revitalization plan (CCRP) from 17 target cities. As the results of analyzing land readjustment, redevelopment project, and projects for roads, parks, and station plaza as urban infrastructure, the author clarifies the following: 1. CCRP in each city has been proceeded on the basis of infrastructure by PWRUP project without drastic change. For example, almost all land readjustment projects were implemented in blank area or niche of PWRUP's and about 70% of redevelopment projects were planned along arteries by PWRUP. The continuity between the both is strong from the viewpoint thinking urban function, amenity, and recreation important, but partly not from the point making grand urban landscape newly.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call