Abstract

This thesis deals with the bending fatigue test results of welded built-up beams of SS 41, SM 50, SM 58, and HT 80, respectively. The fractures of all these beams initiated at the flange-to-web fillet weld under bending, and it took about 10, 000 or 36, 000 cycles of loading from a visible crack to separation of the flange plate.The test results are compared with those of the welded built-up beams and the longitudinal fillet welded specimens obtained by other investigators. The longitudinal fillet welded specimens indicate the same as or a somewhat greater fatigue strength, than the beams in bending.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.