Abstract

The outline of Large Coil Task (LCT) is described. This work is being carried out as an international collaboration under direction of the International Energy Agency for the purpose of superconducting toroidal coil development for fusion reactor. The common specification and the test conditions are explained. The characteristics of six coils, which are designed on the basis of specification and test condition, are compared. The systems and capacity of the Large Coil Test Facility (LCTF), which is being completed at Oak Ridge National Laboratory, is introduced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call