Abstract

The Shin-Aimoto Hydro-electric Power Station of 124MW has been completed on Kurobe River by Kansai Electric Power Company in 1985. The construction of the longest headrace tunnel of 5.7km was subject to the critical path in the whole project. The feasibility study was carefully carried out from the rock mechanical point of view. Rocks are gneiss, diorite and limestone which belong to Hida Metamorphic Zone in the central Japan, and the mechanical characteristics of rocks showed remarkable variation with wide range. Rock classification was discussed geostatistically with the combination of CRIEPI's method and Barton's Q-system. In order to get successful result in rapid excavation the TBM and long drill-and-blast methods were applied to the above-mentioned headrace tunnel. Also, the mechanism of “loosening” has been analyzed in comparison between TBM and blasting methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.