Abstract

The basic directions of the Action Plan to assess seismic hazard and seismic check of existing nuclear power plants, approved SNRCU and NNEGC "Energoatom", which is the basis for work on seismic monitoring systems of nuclear power plant in Ukraine are represented. The experience of expert of IGPH NAS in this field is explined. The basic principles, their aims and objectives are explined too. The spesification for the Rivne NPP is represented as an example. The situation for each of NPP is outlined for short term.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.