Abstract

This paper deals with reduction of manufacturing time for various types and low volume of products in the process of arc-welding assembly.As an example of "weld-assembly" process, we examined the case of assembling dump-bodies where 23 kinds of bodies are assembled through 26 stages of weld-assembly jigs. The jigs are instantaneously moved to a new configuration by servo motors or pneumatic cylinders, eliminating waiting time to change the arrangement for new products.In order to minimize a total weld-assembly time, a simulation-method was developed for determining the most suitable sequence of works. A result of simulation shows that a difference of total time between the most suitable and the worst cases is as great as 9%. To maintain a good process efficiency with the help of the simulation, data-aquisition system was established to get the weld-assembly time for each work at each stage, and the weld-assembly line was designed to centrally computer-controlled.At the early stage of the development simulation time was too long to use the method practically, therefor we examined the way of reducing simulation-time by the characteristics of specific combination of work-sequences and so on.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.