Abstract

ABSTRACT The revised Murray-Darling Basin Plan is scheduled for 2026. Given the Plans complexity, and issues involved in the revision it is worth asking what will be the main drivers of change? What changes can reasonably be anticipated? What preparations should stakeholders make for their engagement in the planning process? As we move towards the next Basin Plan, there are multiple wheels in motion that could shape the future. Several factors we anticipate being important are examined. Our aim is to stimulate stakeholders to think about and prepare for major contingencies that could affect their interests. We focus on those that will likely affect water availability, and changes in policy and water-governance by public agencies. We take the starting point that rivers are complex social-ecological systems, within which structural circumstances and forms of social capital will affect individuals’ and communities’ abilities to maximise what they achieve from their natural assets, and their resilience to unfavourable contingencies. We conclude with some observations about how stakeholders might strengthen their ability to respond to opportunities or threats. While the future is always uncertain and all planning processes are flawed, how stakeholders conceive of and respond to today’s challenges will substantially affect their capacity to be resilient.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.