Abstract

Verification of the MRNK+KEDR-D software system being developed for calculating reactor dynamics is performed using the numerical benchmark-test PWR MOX/UO2 Transient Benchmark. The nonstationary process leading to an abrupt change of power caused by injection of large positive reactivity ~1.1 s in 0.1 sec is studied. Analysis and a comparison of the obtained results with similar calculations performed using different software showed that the compared parameters are in agreement with one another to within admissible deviations.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call