Abstract

In this work, we identify important multiunit risk factors based upon interviews with Tokyo Electric Power Company (TEPCO) engineers. These results provide first-hand information on multiunit risk factors that were important during the 2011 Fukushima accidents. Majority of the interviewees were involved in Fukushima Daiichi and Daini accident mitigation during March 2011. Interviewees worked at Daiichi and Daini sites and headquarters provided views of the accidents from different perspectives. They explained difficulties during the accident mitigation response phase due to lack of multiunit accident experience, and lack of necessary resources. In addition to the risk factors, corresponding site improvement suggestions are discussed based upon our reviews of the interview results. The identified risk factors and site improvement suggestions can be utilized as analysis subjects in future multiunit risk studies as well as references for nuclear sites to identify important multiunit risk vulnerabilities.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.