Abstract

AbstractThis paper considers scheduling problems with human operators having the option to perform multiple rate‐modifying activities (MRMAs) while they are carrying out multitasking. Thus, the processing of a selected task suffers jointly from interruptions by other available but unfinished tasks and MRMAs. Two types of objective functions are studied: single‐criterion minimizing the total completion time, and multicriteria minimizing a weighted combination of the total completion time, the total absolute differences in completion times, and a weighted combination of the total waiting time and the total absolute differences in waiting times. We propose optimal solution algorithms for all the studied problems and also analyze some special cases of them.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.